Novopro has been involved in multiple Base and Precious Metals projects. From extraction to crushing, preliminary processing and concentration all the way to final product, the Novopro team has gained experience through the development of multiple projects. Testwork confirmation and process design are integral to the method used for project design and implementation. The team’s experience and know-how allow Novopro to bring value to clients throughout the world. Related Projects
The Project involved the investigation to bring GMH Copper Processing Facility, which was constructed and started up in 2006, and operated until 2009, back into operation as well as increase nameplate capacity
The Bongará Zinc-Oxide Project located in the Amazonas Department of North-Central Peru. Bongará is a Mississippi Valley Type (MVT) base metal deposit characterized by high-grade zinc with associated lead and silver mineralization that is potentially at or close to the surface
The Buhemba Gold Project is located in Tanzania and features a carbon-in-leach (CIL) Plant for 3,000 tonnes per day of ore throughput.